JJMac Maskew Ave – Building and Externals Stabilisation

Maskew Ave

Building and Externals Stabilisation

JM2735 – Building and Storage Depot Stabilisation
Project JM2735 – Building and Storage Depot Stabilisation
Location Maskew Avenue Peterborough Development
Client Barnack Estates
Key works delivered Capping and Subbase Replacement - Stabilisation
Project Duration October 2022
Stabilised Area 5000 m2
Earthworks By JJMac Ground Stabilisation
PROJECT OVERVIEW
PROJECT CHALLENGES
ENGINEERING AND SOLUTIONS TO OVERCOME THE CHALLENGES
To overcome the project challenges set by the client, our team:
LEVELLING AND REMEDIATION
Maskew Ave 1
SITE READY FOR STABILISATION
Maskew Ave 2
Maskew Ave 3
STABILISATION CONSTRUCTION
Agile equipment utilised for this job due to the confines of the site. JJMac could not utilise any area outside the site boundary. Tractor mounted Stabilisation Wirtgen 250WS Mixers were selected for this project
Maskew Ave 4
Maskew Ave 5
COMPLETED WORKS
Stabilised area with 6f protection layer ready for construction works
Maskew Ave 6
Maskew Ave 7
ADVANTAGES
The works had numerous advantages to this site.
BENEFITS TO CLIENT
JMac are experts in Soil and Ground Stabilisation using lime, cement and other binder materials. Ground Stabilisation geotechnically enhances waterlogged or weaker soils and allows for greater weight bearing for construction materials. JJMac can provide an exceptionally cost-effective construction method for improving the weight bearing properties of any soil found on site and at a competitive rate.


Cost Saving
40%
Programme Reduction
50%
Vehicle Movements Reduction
45%
Imported Aggregate Reduction
75%
Material Sent To Landfill Reduced By
90%
Stone Layer Depth Reduction
70%


SOIL STABILISATION RDC REMEDIATION GROUND STABILISATION EARTHWORKS