The Challenge

JJMac Limited Civil Engineering site crews got Earthworks underway for Kier Living on their New Housing site at Fenstanton. Works began with the Archaeology Topsoil and Subsoil removal. The works is programmed in 2 No:. phases with top soil being stored on site for re-use and the subsoil being removed from site as necessary.

The Solution

We used our new JCB 225 and Caterpillar DN6. Both fitted with GPS Topcon levelling instrumentation to re-engineer the subsoil to proposed site levels and engineering layers specification.

GPS Topcon levelling instrumentation

Archaeology Topsoil and Subsoil removal

Re-Engineering Subsoil

Site Levels

The Challenge Vivamus ipsum velit, ullamcorper quis nibh non, molestie tempus sapien. Mauris ultrices, felis ut eleifend auctor

Engineering Layers

The Challenge Vivamus ipsum velit, ullamcorper quis nibh non, molestie tempus sapien. Mauris ultrices, felis ut eleifend auctor

Extensive Onsite Studies

The Challenge Vivamus ipsum velit, ullamcorper quis nibh non, molestie tempus sapien. Mauris ultrices, felis ut eleifend auctor

Topcon Instrumentation

Trainee engineer Jordan Donnelley

  • Progress 60%
  • Resources 5%
  • Cost & Budget 60%
  • Health & Safety 100%

The Results

Vivamus ipsum velit, ullamcorper quis nibh non, molestie tempus sapien. Mauris ultrices, felis ut eleifend auctor, leo felis vehicula quam, ut accumsan augue nunc at nisl. Vivamus ipsum velit, ullamcorper quis nibh non, molestie tempus sapien. Mauris ultrices, felis ut eleifend auctor, leo felis vehicula quam, ut accumsan augue nunc at nisl.