JJMac Buxton Road Spixworth – Adoptable Road Stabilisation

Buxton Road Spixworth

Adoptable Road Stabilisation

JJM2758 – Adoptable Roads Stabilisation
Project JJM2758 – Adoptable Roads Stabilisation
Location Buxton Road Spixworth Housing Development
Client Norfolk CC
Key works delivered Capping and Subbase Replacement - Stabilisation
Project Duration Oct 2022
Stabilised Area 5000 m2
Earthworks By MC
Buxton Road Spixworth Map
PROJECT OVERVIEW
PROJECT CHALLENGES
The project programme was challenging mainly due to the high loading on the 300mm layer. Binder spreading, water delivery and mixing had to be very precise to ensure the design CBR would be achieved. Furthermore, Cement and Water are expensive resources now and must be used very efficiently.
The project has a very stringent test and compliance schedule. All target MCV and CBR test were taken daily
Poor CBR % at formation level would require careful working with heavy machinery not to damage the formation.
ENGINEERING AND SOLUTIONS TO OVERCOME THE CHALLENGES
To overcome the project challenges set by the client, our team:
Buxton Road Spixworth 3 Buxton Road Spixworth 4
Buxton Road Spixworth 5
ADVANTAGES
The works had numerous advantages to this site.


SOIL STABILISATION RDC REMEDIATION GROUND STABILISATION EARTHWORKS