JJMac Recent Projects

Building with Perfection

BUILDING FOR THE FUTURE




SELECTED CIVIL ENGINEERING PROJECTS
JJMac Marina Dock Barrow in Furness

Marina Dock Barrow in Furness

Site Remediation

Demolition and Re-development of the former Marina Dock Yards. The site required approx 100,000m3 of Material Remediation – approx. 2.0m deep
JJMac Ansty Park Coventry

Ansty Park Coventry

Prospero – Ansty Park Development

Demolition and Re-development of the former Air Field. The site required approx 110,000m3 of earthworks with Modification to the bulk fill.
JJMac Toku

JJMac Experience

Bourne

Our work experience candidate Toku sends his thanks and gratitude to all at JJMac for giving him the opportunity to learn from this week with us
JJMac Buxton Road Spixworth

Buxton Road Spixworth

Adoptable Road Stabilisation

Adoptable Spine Road identified as suitable for Capping and Subbase replacement by Cement Bound Material Stabilisation of the site won excavated material.
JJMac Karting Ancaster Raceway

Karting

Ancaster Raceway

JJMac staff team building at the weekend with a great day Karting @ Ancaster Raceway.
JJMac Maskew Ave Building and Externals Stabilisation

Storage Depot

Maskew Ave

Building and Externals Stabilisation. Our task was re-development of the former Parcelforce site in Peterborough.
JJMac RWM & Letsrecycle Live 2022

RWM & Letsrecycle Live

NEC Birmingham

JJMac were pleased to be of the UK's leading event for Recycling and Waste Management at NEC Birmingham.
JJMac Hillhead 2022

HILLHEAD 2022

Hillhead Quarry Buxton

Recently we attended HILLHEAD 2022 – the UK’s largest exhibition of construction, recycling, and quarrying held in Buxton.
JJMac North Calvert Haul Road

HAUL ROAD

North Calvert

The loading required from 300mm Layer. The Haul Road is to be used to cart excavated material with some 50No 45tn Dump trucks trafficking every day. A combination of Lime and Cement was used to achieve the required loadings.
JJMac Hobhole Lane Boston ROAD RESTORATION

ROAD RESTORATION

Hobhole Lane Boston

Public Highways Access Road to IDB Hobhole Pumping Station had deteriorated and becoming dangerous for delivery truck and the like due to subsidence to one side. JJMac Ground Stabilisation offered a solution.
JJMac Marham Par Adoptable Road

ADOPTABLE ROAD

Marham Park

Agile equipment utilised for the tight working conditions in and around the drainage Fendt tractor and Stehr Tractor mounted Stabilisation Mixer.
JJMac Stevenage Embankment Stabilisation

EMBANKMENT STABILISATION

Stevenage

Working with large machinery required high levels of planning and safety measures in place such as Overbuild of the embankment to allow the equipment to stay min 1.0m from the edge of the embankment.
JJMac Darwin Green Compound Haul Hoads

COMPOUND AND HAUL ROADS

Darwin Green Cambridge

The project was very challenging due to the client requirements for the existing levels of the site. Each area to be stabilised required to be raised min 150mm AGL to prevent water logging.
JJMac Boston STORAGE DEPOT

STORAGE DEPOT

Boston

JJMac team were able to offer a turnkey package on this project, carry out initial Surveys and Assessments of the yard and from this information, we could advise on a Drainage and a Restoration Solution for the yard surface.
JJMac Bicker TREATING STOCKPILE of 6E MATERIAL

COMPOUND

Bicker Fen Lincs

All Earthworks and Screening of material was carried out by JJMac working with Siemens and the land owners.
JJMac Bourne REMEDIATION and STABILISATION

REMEDIATION and STABILISATION

Bourne

All Contaminated soils to be screened to remove as much land fill material as possible and reduce the amount of waste to land fill.
JJMac Stowmarket STOCKPILE MATERIAL TREATMENT

EXTERNAL WORKS

Stowmarket

JJMac invited to site to offer solutions to enable works to progress and to treat the saturated site and return to a workable site.
JJMac Salisbury Trenches for 1917

TRENCHES for “1917”

Salisbury

We attended site and were greeted by some people form a company called Storyworks who were working on a new WW1 movie.
JJMac Ropsley

YARD & HAUL ROAD

Ropsley, Lincolnshire

JJMac limited appointed to undertake 278 Section, Haul Road and Yard construction.
Our Clients
hpc
skanska
unicersal pictures
kier
lidl
siemens
clancy-docwra
johnston-quarry
HS2
Wartsila
black-veatch
anglian water
lagan
gregoire-besson
galliford try
Testimonials
I found them to be a very hard-working, safety conscious and organised team.

Ala Al-Diwani
Devon County Council, Highways,
Capital Development and Waste Management
JJMac completed the project in a professional manner, within budget and working to our unrealistic timetable.

Jason Dixon
Construction Manager, HPC Homes Ltd
JJMac were contacted to convert our caravan storage area, including the large bund walls around the perimeter, to a more useful storage area. This they did with complete professionalism and the results were very pleasing to Delta’s personnel and the many lorry drivers who regularly visit the site. We can now use the whole storage yard for the first time in 20 plus years.

dr Mike Isaac
Managing Director, Delta Caravans International


SOIL STABILISATION RDC REMEDIATION GROUND STABILISATION EARTHWORKS