;

Raunds Northamptonshire

JJ Mac Case Study

The Challenge

JJMac has worked successfully on Kier Living Eastern developments for many years and has evolved to become one of Kier Living Eastern, preferred groundworks contractors. JJMac are currently on schedule to complete the housing development ‘Silver fields’ in Raunds, Northamptonshire.

The Solution

JJMac’s work package at ‘Silver fields’ comprises of the construction of adoptable road & sewers, foundations for 94 units with associated works which include private drainage, carpark areas and landscaping. JJMac commenced work on site in September 2016 and have since completed the Roads and Sewer package and are on schedule for the completion of plots in accordance to Kiers timescale.

GPS Topcon levelling instrumentation

Archaeology Topsoil and Subsoil removal

Re-Engineering Subsoil

Site Levels

The Challenge Vivamus ipsum velit, ullamcorper quis nibh non, molestie tempus sapien. Mauris ultrices, felis ut eleifend auctor

Engineering Layers

The Challenge Vivamus ipsum velit, ullamcorper quis nibh non, molestie tempus sapien. Mauris ultrices, felis ut eleifend auctor

Extensive Onsite Studies

The Challenge Vivamus ipsum velit, ullamcorper quis nibh non, molestie tempus sapien. Mauris ultrices, felis ut eleifend auctor

Topcon Instrumentation

Trainee engineer Jordan Donnelley

  • Stat Title 1 80%
  • Stat Title 2 50%
  • Stat Title 3 75%
  • Stat Title 4 60%

The Results

Vivamus ipsum velit, ullamcorper quis nibh non, molestie tempus sapien. Mauris ultrices, felis ut eleifend auctor, leo felis vehicula quam, ut accumsan augue nunc at nisl. Vivamus ipsum velit, ullamcorper quis nibh non, molestie tempus sapien. Mauris ultrices, felis ut eleifend auctor, leo felis vehicula quam, ut accumsan augue nunc at nisl.