Eaton Socon - North Midlands

JJ Mac Case Study

The Challenge

Undertake major Earthworks/Excavations and Construction of new Steel Frame extension to the existing building within a Live National Grid Sub Station

The Solution

All personnel on site required full HSG47 and BESC training before working on site.
All machines had to height restricted on the site

READ THE CASE STUDY

Please click the link below to download the Eaton Socon North Midlands case study PDF